APA:
Jin, C., Lu, L. J., Min, J. N. (2022). A two-stage construction heuristic approach for vehicle routing problem with split deliveries and pickups: case studies and performance comparison.
Advances in production engineering and management, volume 17, issue 1, str. 121-133.
URN:NBN:SI:DOC-UVEP5QYW from http://www.dlib.si
MLA:
Jin, C., Lu, L. J., Min, J. N.. "A two-stage construction heuristic approach for vehicle routing problem with split deliveries and pickups: case studies and performance comparison."
Advances in production engineering and management volume 17. issue 1 (2022) str. 121-133.
<http://www.dlib.si/?URN=URN:NBN:SI:DOC-UVEP5QYW>