APA:
Xu, E. B., Zou, F. F., Shan, P. P., Wang, Z. Y., Shi, B. X. (2024). An improved multi-objective firefly algorithm for integrated scheduling approach in manufacturing and assembly considering time-sharing step tariff.
Advances in production engineering and management, letnik 19, številka 1, str. 5-20.
URN:NBN:SI:DOC-9MQ8IK84 from http://www.dlib.si
MLA:
Xu, E. B., Zou, F. F., Shan, P. P., Wang, Z. Y., Shi, B. X.. "An improved multi-objective firefly algorithm for integrated scheduling approach in manufacturing and assembly considering time-sharing step tariff."
Advances in production engineering and management letnik 19. številka 1 (2024) str. 5-20.
<http://www.dlib.si/?URN=URN:NBN:SI:DOC-9MQ8IK84>