APA:
Yu, Jianyu (2025). Intelligent construction scheduling based on MOEA/D-DE, SPEA2+SDE, and NSGA-III by integrating safety assessment with resource efficiency.
Informatica (Ljubljana), volume 49, issue 11, str. 17-28.
URN:NBN:SI:DOC-GDYJU73D from http://www.dlib.si
MLA:
Yu, Jianyu. "Intelligent construction scheduling based on MOEA/D-DE, SPEA2+SDE, and NSGA-III by integrating safety assessment with resource efficiency."
Informatica (Ljubljana) volume 49. issue 11 (2025) str. 17-28.
<http://www.dlib.si/?URN=URN:NBN:SI:DOC-GDYJU73D>