APA:
Zhao, Fuqing, Wang, Jizhe, Wang, Junbiao, Jonrinaldi, Jonrinaldi (2012). A dynamic rescheduling model with multi-agent system and its solution method.
Strojniški vestnik, letnik 58, številka 2, str. 81-92, SI 18.
URN:NBN:SI:DOC-KUTUVHVB from http://www.dlib.si
MLA:
Zhao, Fuqing, Wang, Jizhe, Wang, Junbiao, Jonrinaldi, Jonrinaldi. "A dynamic rescheduling model with multi-agent system and its solution method."
Strojniški vestnik letnik 58. številka 2 (2012) str. 81-92, SI 18.
<http://www.dlib.si/?URN=URN:NBN:SI:DOC-KUTUVHVB>