APA:
Nidhiry, N. M., Saravanan, R. (2014). Scheduling optimization of a flexible manufacturing system using a modified NSGA-II algorithm.
Advances in production engineering and management, letnik 9, številka 3, str. 139-151.
URN:NBN:SI:DOC-VIMRABOU from http://www.dlib.si
MLA:
Nidhiry, N. M., Saravanan, R.. "Scheduling optimization of a flexible manufacturing system using a modified NSGA-II algorithm."
Advances in production engineering and management letnik 9. številka 3 (2014) str. 139-151.
<http://www.dlib.si/?URN=URN:NBN:SI:DOC-VIMRABOU>